STANDARD EQUIPMENT
- 7000 gallon tank 8'-0" diameter by
approximately 19' high.
- Made from 1/4" carbon steel.
- Tank insulated with 3" fiberglass and covered
with aluminum jacketing for all weather protection, including bottom
and top.
- Tank erected on and attached to steel stand to
place bottom of tank 7'-0" above ground, 3'-0" above ground with option
"A" (pump).
- Equipped with ladder and safety rail to provide
access to door on top of tank. Ladder is enclosed to meet OSHA
specifications as shown on plans.
- Equipped with a minimum of nine (9) 800 watt
electric heat strips (7,200 watt total), (220 volts), attached to the
outside bottom of tank as shown on plans. Thermostat control 240 volt
single or 3 phase. All tanks must have the ability to maintain a
temperature of 160º F. when the outside temperature is a
negative 10º F.
- Equipped with one (1) 3" steer lever control
ball valve for loading and one (1) 3" check valve on inlet and drain
line. All are to be thermo taped and insulated.
- Loading hose 3" diameter and 12' long flexible
steel with quick coupler at tank end.
- Built-in float gauge for measuring liquid,
reading both English and Metric.
- Equipped with electric driven motor 1 HP single
or 3 phase 220 volt, two (2) bladed agitator, RPM designed for
agitation emulsions, with automatic timer capable of agitating from 5
to 30 minutes, in one minute increments, at set times on any given day
of the week.
- One (1) temperature gauge, 4" dial type
50º F. to 200º minimum.
- Concrete pad and steel support plates to be
constructed by customer as per attached plans.
- Customer will be responsible for required
welding to foundation pads.
- Wiring from storage tank control boxes to power
supply to be done by customer.
- All plumbing to be done by vendor.
- One (1) 110 volt G.F.I. plug.
- Vendor will construct sufficient hooks on the
tank for unloading and lifting onto pad. Cranes for doing this will be
provided by customer. Vendor must notify customer 48 hours prior to
delivery.
- Customer will provide welder to weld legs to
lag plates on pads as directed by contractor.
- Tanks and structures must meet all applicable
Federal And State codes including electrical components and wind
velocity requirements. Successful bidder shall certify that tanks and
structures meet such laws & codes.
- Tank and all attachments to have a one (1) year
warranty from date of operation.
OPTIONAL EQUIPMENT
- Equipped with an electric 220 volt three phase
motor 10 H.P. and 3" reversible 200 gallon per minute pump system
designed to pump emulsion, mounted on stand with a 3” lever
ball valve between pump and tank. For loading and unloading the storage
tank. Not Required for circulating emulsions.
- Special lo-density tube type heaters (in liew
of standard heat strips) for hot 350ºF/400F asphalt.
- 26KW "Unitized Heater Kit". The heater tubes
will be made of 3" Sch 40 black iron pipe. The tubes will be mounted
through the side of the tank and include a heavy duty terminal box. The
open coil elements will be designed to operate on 240/480 volt. 3 or 1
phase power (specify when ordering). The elements will be removable
from the tank without draining (dry well type). This heater kit is
sized for heating a 7,000 gallon asphalt storage tank. Will maintain a
temperature of 400ºF when the outside temperature is a
negative 10ºF. (For use with AC type hot asphalt).
|
|